This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionLast revisionBoth sides next revision | ||
en:publi [2013/10/05 21:02] – mserairi | en:publi [2014/06/11 11:50] – mserairi | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Journal article ====== | ====== Journal article ====== | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
===== To appear ===== | ===== To appear ===== | ||
- | * Moukrim, A. and Rebaine, D. and Serairi, M. **A branch and bound algorithm for the two-machine flowshop problem with unit-time operations and time delays**. RAIRO-Operations Research, | + | |
+ | |||
+ | |||
+ | |||
+ | |||
+ | ===== 2014 ===== | ||
+ | | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
===== 2013 ===== | ===== 2013 ===== | ||
- | * Oulamara, A. and Rebaine, D. and Serairi, M. **Scheduling the two-machine open shop problem under resource constraints for setting the jobs**. Annals of Operations Research, 1-24,2013 | + | * Oulamara, A. and Rebaine, D. and Serairi, M. **Scheduling the two-machine open shop problem under resource constraints for setting the jobs**. Annals of Operations Research |
+ | * Gharbi, A. and Ladhari, T. and Msakni, M.K. and Serairi, M. **The Two-Machine Flowshop Scheduling Problem with Sequence-Independent Setup Times: New Lower Bounding Strategies**. European Journal of Operational Research 231(1), 69-78, 2013 | ||
- | * Gharbi, A. and Ladhari, T. and Msakni, M.K. and Serairi, M. **The Two-Machine Flowshop Scheduling Problem with Sequence-Independent Setup Times: New Lower Bounding Strategies**. European Journal of Operational Research, 2013 | ||
===== 2011 ===== | ===== 2011 ===== | ||
* Haouari, M. and Serairi M. **Relaxations and exact solution of the variable sized bin packing problem**. Computational Optimization and Applications 48 (2), 345-368, 2011 | * Haouari, M. and Serairi M. **Relaxations and exact solution of the variable sized bin packing problem**. Computational Optimization and Applications 48 (2), 345-368, 2011 | ||
===== 2009 ===== | ===== 2009 ===== | ||
* Haouari, M. and Serairi, M. **Heuristics for the variable sized bin-packing problem**. Computers & Operations Research 36 (10), 2877-2884, 2009 | * Haouari, M. and Serairi, M. **Heuristics for the variable sized bin-packing problem**. Computers & Operations Research 36 (10), 2877-2884, 2009 | ||
- | |||
====== In proceedings ====== | ====== In proceedings ====== | ||
+ | |||
===== 2013 ===== | ===== 2013 ===== | ||
- | * Kooli, A. and Serairi, M. **An assignment based lower bound for the single machine with unequal release dates**. The 11th Workshop on Models and Algorithms for Planning and Scheduling Problems (MAPSP), Pont a Mousson, France June 23-28, 2013. | + | * Kooli, A. and Serairi, M. **An assignment based lower bound for the single machine with unequal release dates**. The 11th Workshop on Models and Algorithms for Planning and Scheduling Problems (MAPSP), Pont à Mousson, France June 23-28, 2013. |
+ | * Oulamara, A. and Rebaine, D. and Serairi, M. **Open shop scheduling problem with time- dependent resource consumption**. The 11th Workshop on Models and Algorithms for Planning and Scheduling Problems (MAPSP), Pont à Mousson, France June 23-28, 2013. | ||
- | * Oulamara, A. and Rebaine, D. and Serairi, M. **Open shop scheduling problem with time- dependent resource consumption**. The 11th Workshop on Models and Algorithms for Planning and Scheduling Problems (MAPSP), Pont a Mousson, France June 23-28, 2013. | ||
===== 2012 ===== | ===== 2012 ===== | ||
* Gharbi, A. and Ladhari, T. and Msakni, M.K. and Serairi M. **Tight lower bounds for the two- machine flowshop scheduling problem with setup times**. 13th International Conference on Project Management and Scheduling (PMS), Leuven Belgium April 1-4, 2012. | * Gharbi, A. and Ladhari, T. and Msakni, M.K. and Serairi M. **Tight lower bounds for the two- machine flowshop scheduling problem with setup times**. 13th International Conference on Project Management and Scheduling (PMS), Leuven Belgium April 1-4, 2012. | ||
- | |||
===== 2010 ===== | ===== 2010 ===== | ||
* Gharbi, A. and Ladhari, T. and Msakni, M.K. and Serairi, M. **Polynomial lower bounds for the two-machine flowshop problem with sequence-independent setup times**. Electronic Notes in Discrete Mathematics 36, 1089-1096, 2010 | * Gharbi, A. and Ladhari, T. and Msakni, M.K. and Serairi, M. **Polynomial lower bounds for the two-machine flowshop problem with sequence-independent setup times**. Electronic Notes in Discrete Mathematics 36, 1089-1096, 2010 | ||
- | |||
* Serairi, M. and Haouari, M. **A Computational Study of Lower Bounds for the Two Dimensional Bin Packing Problem**. Electronic Notes in Discrete Mathematics 36, 891-897, 2010 | * Serairi, M. and Haouari, M. **A Computational Study of Lower Bounds for the Two Dimensional Bin Packing Problem**. Electronic Notes in Discrete Mathematics 36, 891-897, 2010 | ||
+ | ====== Seminar and communication ====== | ||
+ | ===== 2013 ===== | ||
+ | * Kooli, A. and Serairi, M. **A new exact method for the single machine problem subject to release dates**. The 26th European Conference on Operational Research Rome 1-4 July 2013. | ||
+ | * SASSI, O. and Oulamara, A. and Ramdane Cherif, W. and Roset, A. and Serairi, M. and Shevchenko, E. **Integrated model for electric vehicles routing and optimal charging**. The 26th European Conference on Operational Research Rome 1-4 July 2013. | ||
+ | * SASSI, O. and Oulamara, A. and Ramdane Cherif, W. and Roset, A. and Serairi, M. and Shevchenko E. (2013) **Planification conjointe des tournées et de la recharge des véhicules électriques**. ROADEF Troyes, France 13–15 février, 2013. | ||
+ | ===== 2011 ===== | ||
+ | * Gharbi, A. and Ladhari, T. and Msakni, M.K. and Serairi M. **Bounding Schemes for Scheduling a Two-Machine Flowshop with Set-up Times**. International Conference and Exhibition on Knowledge Business, Industry and Education, KBIE 2011, Bahrain. | ||
+ | ===== 2010 ===== | ||
+ | * Ipenza, L.A.M. and Moukrim, A. and Serairi, M. **Système intégré de manutention de conteneurs dans un terminal maritime**. ROADEF Toulouse, France 24–26 février, 2010. |