UMR CNRS 7253

Site Tools


en:publi

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Last revisionBoth sides next revision
en:publi [2013/10/06 09:33] mserairien:publi [2014/06/11 11:50] mserairi
Line 1: Line 1:
 ====== Journal article ====== ====== Journal article ======
 +
 +
 +
 +
 +
 ===== To appear ===== ===== To appear =====
-  * Moukrim, A. and Rebaine, D. and Serairi, M. **A branch and bound algorithm for the two-machine flowshop problem with unit-time operations and time delays**. RAIRO-Operations Research, to appear+  * Kooli, A. and Serairi, M. **A Mixed Integer Programming approach for the single machine problem with unequal release dates**. Computers & Operations Research 
 + 
 + 
 + 
 + 
 +===== 2014 ===== 
 +  * Moukrim, A. and Rebaine, D. and Serairi, M. **A branch and bound algorithm for the two-machine flowshop problem with unit-time operations and time delays**. RAIRO-Operations Research 48(2), 235-2542014 
 + 
 + 
 + 
 + 
 + 
 ===== 2013 ===== ===== 2013 =====
-  * Oulamara, A. and Rebaine, D. and Serairi, M. **Scheduling the two-machine open shop problem under resource constraints for setting the jobs**. Annals of Operations Research1-24, 2013 +  * Oulamara, A. and Rebaine, D. and Serairi, M. **Scheduling the two-machine open shop problem under resource constraints for setting the jobs**. Annals of Operations Research 211(1), 333-356, 2013 
-  * Gharbi, A. and Ladhari, T. and Msakni, M.K. and Serairi, M. **The Two-Machine Flowshop Scheduling Problem with Sequence-Independent Setup Times: New Lower Bounding Strategies**. European Journal of Operational Research, 2013+  * Gharbi, A. and Ladhari, T. and Msakni, M.K. and Serairi, M. **The Two-Machine Flowshop Scheduling Problem with Sequence-Independent Setup Times: New Lower Bounding Strategies**. European Journal of Operational Research 231(1), 69-78, 2013 
 ===== 2011 ===== ===== 2011 =====
   * Haouari, M. and Serairi M. **Relaxations and exact solution of the variable sized bin packing problem**. Computational Optimization and Applications 48 (2), 345-368, 2011   * Haouari, M. and Serairi M. **Relaxations and exact solution of the variable sized bin packing problem**. Computational Optimization and Applications 48 (2), 345-368, 2011
Line 10: Line 28:
   * Haouari, M. and Serairi, M. **Heuristics for the variable sized bin-packing problem**. Computers & Operations Research 36 (10), 2877-2884, 2009   * Haouari, M. and Serairi, M. **Heuristics for the variable sized bin-packing problem**. Computers & Operations Research 36 (10), 2877-2884, 2009
 ====== In proceedings ====== ====== In proceedings ======
 +
 ===== 2013 ===== ===== 2013 =====
-  * Kooli, A. and Serairi, M. **An assignment based lower bound for the single machine with unequal release dates**. The 11th Workshop on Models and Algorithms for Planning and Scheduling Problems (MAPSP), Pont Mousson, France June 23-28, 2013. +  * Kooli, A. and Serairi, M. **An assignment based lower bound for the single machine with unequal release dates**. The 11th Workshop on Models and Algorithms for Planning and Scheduling Problems (MAPSP), Pont à Mousson, France June 23-28, 2013. 
-  * Oulamara, A. and Rebaine, D. and Serairi, M. **Open shop scheduling problem with time- dependent resource consumption**. The 11th Workshop on Models and Algorithms for Planning and Scheduling Problems (MAPSP), Pont Mousson, France June 23-28, 2013.+  * Oulamara, A. and Rebaine, D. and Serairi, M. **Open shop scheduling problem with time- dependent resource consumption**. The 11th Workshop on Models and Algorithms for Planning and Scheduling Problems (MAPSP), Pont à Mousson, France June 23-28, 2013. 
 ===== 2012 ===== ===== 2012 =====
   * Gharbi, A. and Ladhari, T. and Msakni, M.K. and Serairi M. **Tight lower bounds for the two- machine flowshop scheduling problem with setup times**. 13th International Conference on Project Management and Scheduling (PMS), Leuven Belgium April 1-4, 2012.   * Gharbi, A. and Ladhari, T. and Msakni, M.K. and Serairi M. **Tight lower bounds for the two- machine flowshop scheduling problem with setup times**. 13th International Conference on Project Management and Scheduling (PMS), Leuven Belgium April 1-4, 2012.

User Tools